See the article’s sources and scope. Our editorial standards
A useful build journal answers three questions: what was true before a change, why you chose it, and what you observed afterward. It should also preserve decisions to wait. The template below is an original Gearline planning aid, not a record of a car we have built.
Give every entry an evidence status
| Stage | What to record |
|---|---|
| Observed | A dated photo, measurement, invoice or inspection finding, with vehicle and odometer. |
| Considering | Goal, alternatives, expected cost and the question that remains unanswered. |
| Ordered | Exact part number, supplier, price and the fitment claim you checked. |
| Installed | Who did the work, date, actual cost, settings and supporting paperwork. |
| Follow-up | A dated observation or measurement after use; include problems and reversals. |
Do not fill the “after” field from a product description or someone else’s build. If the part is only on a shortlist, mark the outcome as pending. Keep photos and receipts in a folder and put their filenames in the entry; the CSV contains references, not the files themselves.
Worked entry: a purchase postponed
This entry is fictional. No Gearline car was inspected, measured or fitted with these wheels. It demonstrates how a journal keeps a calculation separate from a fitment decision.
| Field | Example entry |
|---|---|
| Goal | Consider a wider wheel while keeping daily-use clearance. |
| Starting point | Assumed 7 in / +48 mm wheel. Actual vehicle measurement and part number: not yet recorded. |
| Candidate | 8 in / +40 mm wheel. Nominal outer edge +20.7 mm; nominal inner clearance −4.7 mm versus the assumed starting point. |
| Cost | Wheel, tire, installation and alignment quotes: pending. Actual paid: $0; nothing ordered. |
| Decision | Wait for exact vehicle application, brake clearance, tire choice, mounting hardware and a complete installed quote. |
| After evidence | Blank. No fitment or road-test result exists. |
The geometry comes from our wheel-offset comparison; it does not establish that a wheel fits a particular car. A real journal would replace the assumed baseline with measurements and supplier documentation.
Copy the record, then review it
Open the build-journal CSV template. Its blank row and columns cover the vehicle, odometer, stage, goal, evidence, alternatives, costs, work completed and next check. Save your own copy; this file does not send your entries to Gearline.
One row should describe one decision or completed change. Use separate rows if a later repair changes the result. Record the currency alongside estimated and actual totals; do not compare amounts in different currencies without converting them. Keep the original quote and final invoice so you can explain a difference instead of overwriting the estimate.
For a cost breakdown before ordering parts, use the modification budget planner. It estimates a plan in your current browser, while your saved journal records what happened over time.
Share claims you can support
When sharing a build, label a supplier specification as a specification, a shop measurement as a measurement and a driving impression as an impression. Credit photographs and disclose commercial relationships. A decision to postpone an upgrade because the fitment or total cost was unclear is a useful entry too.
The worked entry is hypothetical and the CSV is an editorial tool. Gearline has not performed an owner interview, installation or road test for this article.
Update: Updated October 8, 2026: added a reusable CSV journal, a fictional decision entry and a record format that separates plans from completed work.